The Onboarding Process
Onboarding is the 14-Day Launch (Step 1): a one-time, fixed-scope, fixed-price engagement that builds your platform and cuts over to live operations. It runs in parallel with your live product, with zero disruption — nothing breaks while we work.
Everything we build here is yours. The Platform is instantiated during these two weeks as Infrastructure-as-Code, documentation, and dashboards — assets you keep forever, even if you never sign the retainer.
The timeline
Section titled “The timeline”-
Kickoff & access
We agree the points of contact, set up the shared communication channel (Teams or Slack), and receive scoped access to the cloud account/subscription, the cluster, and the repositories.
-
Audit deep-dive (Day 5)
The Platform Audit & Scorecard lands. It confirms the scope tier and the target architecture, and prioritizes what we harden first.
-
Build the infrastructure
We codify the foundation as Infrastructure-as-Code on your chosen cloud — networking, identity, data stores, DNS/TLS — provisioned reproducibly with Terraform/OpenTofu.
-
Stand up containerization & CI/CD
We bring up the Kubernetes layer and wire in CI/CD — a build-and-verify pipeline on your VCS and GitOps delivery with ArgoCD, including safe, automated rollbacks.
-
Observability & security baseline
We deploy the Grafana observability stack with live, shared dashboards, and apply the security-hardening baseline — continuous patching, automated scanning, secrets management.
-
Cutover to live operations
We move the platform to live, DCF-led operations. From this point on you’re in The Operation.
What you provide
Section titled “What you provide”To keep the two weeks moving, we need:
- Scoped access to the cloud, cluster, and repos (read-write for the build, agreed up front).
- Points of contact on your side for decisions and approvals.
- A shared channel (Teams or Slack) where we work in the open.
What you walk away owning
Section titled “What you walk away owning”The Keep-It-All Promise: all of these are yours to keep, even if you never sign the retainer.
- Complete documentation of the platform — no longer trapped in one person’s head.
- The full Infrastructure-as-Code for every layer.
- The observability stack and live dashboards — your transparency window into everything we run.
After cutover: Hypercare
Section titled “After cutover: Hypercare”The Launch includes 30 days of post-launch Hypercare — we stay glued to the platform through stabilization before the cadence settles into the steady-state Operation.